Rotary Hammer Price: What Importers Actually Pay For
The price of a rotary hammer is the sum of configuration and commercial terms: capacity class, motor type, voltage and plug, certification scope, packing and spare parts. YOWEL quotes against a specification, not a model name alone. MOQ 500, five pieces per carton, 35 to 40 days and FOB, CFR or CIF set the baseline, so compare like for like.
Quick answer
- We do not publish a price list. A rotary hammer quotation is a configuration: model, voltage, plug, certification scope, packaging, quantity, spare parts and delivery terms.
- Capacity and power set the platform. Our corded range runs 20, 22, 26 and 28 mm in concrete; the DC21V cordless range is one 22 mm class.
- Commercial terms are fixed and published. MOQ 500 pcs, trial orders from 100 pcs, 5 pcs per carton, 35–40 days, T/T or L/C, FOB / CFR / CIF, HS 84672100, 1% free spare parts.
- Check the landed cost, not the unit line. Carton cube, freight mode, destination clearance, certification route and service stock all change what the container really costs.
- Two quotes are comparable only with the same specification. Match model, plug, certificate scope, carton and spare-parts terms before comparing numbers.
1. Why there is no single rotary hammer price
"Rotary hammer price" is a search phrase, not a specification. The machine behind the phrase may be a 500 W two-mode tool or a 900 W professional three-mode tool, with a different plug, box, certificate scope and order quantity. Any single number would be true for one configuration and misleading for the rest.
A quotation is a configuration, not a catalogue line
We quote against a written specification. That specification fixes the model, the capacity class, the voltage and plug, the colour and packaging, the documents required for your market, the quantity and the delivery term. Change one of those and the quote has to be recalculated. This is not sales framing — it is how a factory avoids promising a certificate or a plug that the production run cannot carry.
What is published and what is quoted
Electrical and performance values come from the approved parameter sheet: input power, impact energy, speed, blow rate, capacity and function modes. Commercial conditions come from a separate business-terms sheet. A price itself is neither of those documents: it is calculated per order. If a webpage shows a number without naming the configuration, treat it as a different conversation from a factory quotation.
| Information type | Where it lives | What we state publicly |
|---|---|---|
| Electrical / performance | Approved YOWEL parameter sheet | Power, joules, rpm, bpm, capacity, modes, weight, duty cycle. |
| Commercial terms | Confirmed business-terms sheet | MOQ, carton quantity, lead time, payment, Incoterm, HS code, spare-parts allowance. |
| Unit price | Per-order quotation | Not published: it depends on the configuration and quantity. |
| Certification | Per-model document set | Names recorded; scope and copies confirmed in writing per model. |
For the reasoning behind the two-sheet approach, see the wholesale buying guide. For the numbers themselves, open the individual model page.
2. Seven components of a wholesale quotation
When importers ask why two quotations differ, the answer is almost never a single hidden discount. It is one or more of the following seven inputs written differently on the two sheets.
Capacity, power and mechanism
A 20 mm or 22 mm class and a 26 mm or 28 mm class are not interchangeable lines. Power, impact energy, mechanism size and weight rise with the class; the capacity selection guide explains what the rated capacity row means before price is discussed. Only the 500 W RH2001 is two-function; the rest of the range is three-function.
Motor, components and configuration
Motor type, component grade, voltage version and plug standard all sit inside the unit cost. The corded range is offered in 110 V and 230 V versions on a 2 m cable with EU, BS or OEM plugs. The cordless range is brushless and has its own charger and battery configuration, so it should never be priced as a corded tool with a battery added.
Certification and market documents
We record CE, GS, EMC, ROHS and ISO by name. The applicable scope depends on the model, the charger and the destination market, so it is confirmed in writing per model and issued with the quotation. EAC for Russia is a separate route, and we do not claim to hold it. A quote that ignores document scope is not comparable with one that includes it.
Colour, packaging and carton
Standard packaging is a colour sleeve or BMC box at five pieces per carton. Pantone-matched colour tooling runs in batches of 500 pieces, with a 5–7 day tooling window and a one-time fee typically waived against a 12-month contract; a colour chip follows within five working days. Carton cube affects freight more than most buyers expect, so packaging belongs in the cost discussion, not after it.
Spare parts and service plan
Every order carries a 1% free spare-parts allowance. For active OEM SKUs we hold a 30-day rolling buffer and dispatch from Taizhou within 48 hours. Those are published terms, not optional extras priced separately. What varies is how much stock you choose to hold locally, which is a decision for your service network rather than our invoice.
Quantity, payment and delivery term
MOQ is 500 pieces per SKU per shipment, with SKUs mixed inside one container. Trial orders can ship from 100 pieces at a higher unit cost. Payment is T/T or L/C; delivery is quoted FOB, CFR or CIF. Each of these changes the number on a quotation sheet, which is why they must be written identically before two offers are compared.
| Quote input | Fixed / variable | What the buyer must specify |
|---|---|---|
| Model and capacity class | Fixed per SKU | Model number and the "Max drilling capacity / Concrete" row. |
| Voltage and plug | Variable | 110 V or 230 V; EU, BS or OEM plug by name. |
| Certificate scope | Variable per model and market | Which documents the importer requires. |
| Colour and packaging | Variable | Standard finish or Pantone reference; sleeve or BMC. |
| Order quantity | Variable | 500 pcs MOQ, or 100 pcs trial order. |
| Spare-parts allowance | Fixed term, parts vary by model | Which models and quantities the allowance covers. |
| Delivery and payment | Variable | FOB / CFR / CIF; T/T or L/C; destination port. |
3. Capacity classes: where the money goes
Price follows what the tool is built to do. Within our own range the class pattern is visible in published specifications; where a class sits in your quotation is a commercial question resolved per order, not a fixed band.
20mm and 22mm: entry and step-up
The 500 W RH2001 is a compact two-mode tool for light work; the 22 mm class steps up before the volume class begins. These are common promotional and price-sensitive channels. For a distributor, the risk is not the unit cost but a mislabelled capacity: the label on a folder is not the figure on the parameter sheet.
26mm: the volume anchor
Seven corded models measure 26 mm in concrete — six at 800 W / 3.0 J and RH2820 at 850 W / 3.1 J — with a 6–18 mm optimum range. This is the class most trade-channel programmes start with; see the 26mm range and the specification of the RH2601. Volume and service stock are both easier here because the class is deep.
28mm: the professional step
RH3018 and RH3020 are rated 28 mm in concrete at 900 W / 3.2 J with a 6–20 mm optimum range. What the buyer is paying for is sustained work rather than a bigger hole. The class serves professional users who need a machine built for a full shift; margins are usually better and turnover slower. The RH3018 specification shows the published figures.
DC21V cordless: a different cost structure
Eight cordless models share one 22 mm class at 2.7–2.8 J, 4.0Ah and a brushless motor. Their cost structure moves from the motor and mains lead to the battery, charger and electronics, and certification and shipping paperwork change with it. Compare them through the cordless range page and the corded vs cordless market guide, not against a corded price line.
| Class | Published figures | Main cost driver in the quote |
|---|---|---|
| 20mm / 22mm corded | 500 W / 1.7 J and step-up models; 3-mode except RH2001. | Entry specification, packaging and order volume. |
| 26mm corded | 800 W / 3.0 J (RH2820: 850 W / 3.1 J), 6–18 mm. | Volume class; configuration and document scope dominate differences. |
| 28mm corded | 900 W / 3.2 J, 6–20 mm. | Heavier mechanism and professional-duty positioning. |
| DC21V cordless | 22 mm, 2.7–2.8 J, 4.0Ah, brushless. | Battery, charger and electronics; separate shipping and certification paperwork. |
Figures from the approved parameter sheet and the "Max drilling capacity / Concrete" row. Cost-driver column is a general sourcing observation, not a published price band or a quotation.
4. MOQ, trial orders and the cost of customisation
Quantity is the first variable most buyers can control. It is also the one most often written differently across quotations.
500 pieces, and what can be mixed
Standard MOQ is 500 pieces per SKU per shipment, and SKUs can be mixed inside one container. Larger runs and repeat contracts can be discussed; the number is a starting point rather than a ceiling.
100-piece trial orders
A trial order can ship from 100 pieces at a higher unit cost. That is a deliberate trade-off: you pay more per tool to test the market without committing a full container. Use the trial to check capacity, plug and packaging against real jobsite feedback before you lock the main order.
Colour tooling and colour chips
Pantone-matched colour tooling is mixed in batches of 500 pieces, with a 5–7 day tooling window and a one-time fee typically waived against a 12-month contract. We return a side-by-side colour chip within five working days of receiving the reference. Confirm these terms in the same document as the unit price — otherwise a "cheaper" offer may appear only because the tooling fee was left out.
| Term | Confirmed value | Where it affects cost |
|---|---|---|
| MOQ | 500 pcs per SKU per shipment; SKUs mixed in one container. | Unit cost and production scheduling. |
| Trial order | From 100 pcs at a higher unit cost. | Market testing before a full container. |
| Lead time | 35–40 days from PO to ex-factory; 5–7 days extra for first Pantone colour tooling. | Cash flow and selling season. |
| Carton | 5 pcs per carton; 4.0 kg gross for corded, 4.8 kg for cordless. | Freight cube and weight. |
| Payment / delivery | T/T or L/C; FOB, CFR or CIF. | What the invoice includes. |
| HS code | 84672100. | Documentation and destination clearance. |
5. Landed cost: what the invoice does not show
The unit price is one line in a container budget. Importers who compare only that line are surprised later by carton volume, freight mode, clearance requirements and the cost of keeping a service network alive.
Carton cube and freight mode
Corded models are packed five per carton at a published 4.0 kg gross weight; cordless cartons are 4.8 kg. Ocean freight is the usual choice for a full order and is quoted FOB, CFR or CIF. Air freight is faster but substantially more expensive; use it for samples and urgent parts, not as the baseline for a seasonal programme.
Destination clearance and documents
HS code 84672100 and the model-specific document set go into the clearance file. Duties, taxes, port charges and inspection rules depend on your market and are handled by your importer or broker — we do not quote a rate we cannot verify. Certification scope is agreed before production, not discovered at the port; the factory profile explains who we are and what we publish.
Service stock as part of the budget
Plan the first parts order with the first container. Our 1% free allowance, 30-day buffer and 48-hour dispatch from Taizhou reduce risk, but they do not remove the need for a local shelf of brushes, switches and chucks. The service page and the spare-parts guide set out what to hold and what to leave in the factory buffer.
6. How to compare two quotations fairly
Most "expensive supplier / cheap supplier" stories end in a comparison that was never like-for-like. Four checks fix that.
Same specification and same plug
Write the model, voltage version and plug standard on both enquiry sheets. A 110 V tool with a BS plug is not the same SKU as a 230 V tool with an EU plug, even if the body looks identical.
Same certificate scope
Ask which certificate covers which model and charger, and request the document list with the quotation. A name without a scope is not a comparable offer. We confirm scope in writing per model and do not claim certificates we do not hold.
Same carton and same spare-parts terms
Confirm pieces per carton, gross weight, packaging type and the 1% allowance in both offers. If one supplier has left the tooling fee or spare parts out, add them back before comparing numbers.
Same delivery term and lead time
FOB, CFR and CIF include different cost buckets. Put the destination port and the 35–40 day production window on both sheets, then compare the total you will actually pay. For the full selection and sourcing checklist, see the product range and the wholesale guide.
7. Five questions about rotary hammer price
Why will you not publish a price list?
Because a number without a configuration is wrong for almost every buyer. Model, voltage, plug, certificate scope, packaging, quantity, spare parts and delivery term all change the quote. Send the configuration and we return a written price against it.
What is the minimum order?
500 pieces per SKU per shipment, with SKUs mixed inside one container. Trial orders can start at 100 pieces at a higher unit cost.
Does the price include spare parts?
The confirmed term is 1% free spare parts with the order. It is a parts allowance in proportion to quantity, not a repair promise; the parts for your SKU are confirmed in the order documents. See the spare-parts guide for what to stock.
How long from PO to ex-factory?
35–40 days for standard OEM orders, plus 5–7 days for first-order Pantone-matched colour tooling. Ocean transit is additional and depends on destination.
Which price term will you quote?
FOB, CFR or CIF, with T/T or L/C payment. We confirm the destination port and the document set before issuing the quotation.
8. What this article deliberately leaves out
No numbers we cannot stand behind
No price list, no market averages, no competitor quotations and no claimed search volumes appear here. Third-party platform listings are public retail or listing data, not a factory quotation; they are not repeated as our price. Any number that matters to your decision should arrive in a written quote naming your configuration.
No invented savings
We do not promise a percentage saving, a duty rate or a payback period. What we can do is put the confirmed parameters and commercial terms on the table, answer questions about your market and issue a quote you can check line by line. Start with a configuration enquiry and we will work from there.
About the data. All electrical and performance figures in this guide come from the approved YOWEL product parameter sheet; capacity classes follow the "Max drilling capacity / Concrete" row, which is why RH2820 is treated as 26 mm and RH3018 / RH3020 as 28 mm regardless of folder name. Commercial figures come from the separate confirmed business-terms sheet (MOQ 500 pcs, trial from 100 pcs, 5 pcs per carton, 35–40 days, T/T or L/C, FOB / CFR / CIF, HS 84672100, 1% free spare parts, QC sampling to ANSI/ASQC Z1.4 / GB/T 2828.1). Carton gross weights are as published: 4.0 kg corded, 4.8 kg cordless. Factory facts: 20+ years, 30,000 m², 200 staff, 4 lines, 600,000 units annual capacity. Certification names only (CE, GS, EMC, ROHS, ISO); EAC is not claimed. No price, price band, duty rate, customer case, search volume or market statistic is asserted. The job-site photograph is illustrative. Confirm every figure on the individual model page and in the written quotation before ordering.
Last reviewed on 17 November 2026 by the YOWEL factory engineering team · ZHEJIANG YOUWEI TOOLS CO.,LTD. · No.85 Taojiang Road, Qiansuo Industrial Zone, Jiaojiang District, Taizhou, Zhejiang, China · [email protected] · +86 178 1658 8178